They look like BLM employees
There seems to be a festering consensus that this bridge was not very well designed.
The core problem seems to be that the designers of this and many other bridges never considered how much larger container ships would eventually get.
VDR sensor data missing during the power failure period (see video around 2:20 timestamp)
If they werenât maintaining their propulsion systems properly, it is not a stretch to think they werenât maintaining their sensor UPS systems either.
Lawsuit. Much oddities of maritime law:
https://www.courtlistener.com/docket/68396058/in-the-matter-of-the-petition-of-grace-ocean-private-limited-for/
It is an ill wind that blows nobody any good. It is simply unfortunate that the beneficiaries of ill winds are so-often lawyers â earning big bucks filing suits and counter-suits, but doing nothing whatsoever to rebuild the bridge and re-open the port.
Yup, youâre guaranteed to be on the winning side, every time!