SpaceX plans to launch 53 Starlink satellites into Shell 4, with an eventual 540 km circular service orbit at 53.22° inclination, on 2022-08-19 at 19:21 UTC. This will be the ninth flight of Falcon 9 booster B1062 with a turn-around time of 26 days since its last flight, also a Starlink mission. The launch will be from Space Launch Complex 40 in Florida.
3 Likes
B1062 holds the record of 21 days:
3 Likes
Better landing than the last two.
3 Likes