Highlights:
-
In-Flight operations plan posted, with notable tweaks
-
Flight termination system installation
-
Booster lifted onto Pad 1
-
Ship lift planned for 4pm Saturday
-
No catch planned–not so soft booster water landing after deliberate stresses on return
-
Plumbing testing campaign at Pad 2
-
Vapor dispersal
-
Ship vacuum engines spotted, presumed for TF11
-
Block 3 Ship design details spotted (TF12+)
-
Gigabay foundation formwork proceeding
-
Booster 18 delays–corresponding test article active at Massey’s
-
Falcon 9: Starlink 17-5, Starlink 17-6, USSF-36 w/ X-37B
-
Brief review of few public USSF-36 details
-
Upcoming Cargo Dragon mission with ISS reboost equipment
-
Sean Duffy making waves at NASA
-
Chinese Lunar Lander testing