Highlights:
-
Ship #36 thrust simulator testing and cryo testing at Masseys
-
Ship #35 static fire testing at Masseys, single and multiple, with bonus flap testing
-
Ship #38 parts arriving for stacking
-
High bay demolition continuing, piece of star factory being removed too.
-
Pad B launch mount assembly progress and speculation
-
Pad B flame trench wall and plumbing install progress
-
ULA Atlas V carries Kuiper batch 1 to orbit
-
Falcon 9: Starlink 12-23, Starlink 11-9, Starlink 12-10, Starlink 6-75
-
Firefly Alpha “Message in a Booster” failure at stage separation dooms mission to improper orbit and reentry
-
Lockheed Martin Inflatable Module test to failure success
-
ISS Solar Array deployment
-
European Space Agency launches BioMass mission with Arianespace Vega C