Highlights:
-
SpaceX Earnings call coverage, more Flight 14 video releases.
-
Fantastic heat shield condition captured by drone at the alternate landing zone.
-
Double catch plans affirmed for Flight 15
-
HLS Ship with nose docking ring already under construction
-
Artemis “Acceleration” plan revealed by NASA, with HLS pushing Orion to Low Lunar Orbit (beyond SLS’ envelope).
-
Rough schedule for Starship propellant transfer demonstration(s).
-
Preparations for upcoming Booster 22 static fire.
-
Pad 2 will do both catches, about 20 hours apart.
-
Pad 1 progress report
-
Booster 23 cryo testing success at Massey’s. Will have engine install and static fire before shipping to FL.
-
Ship 43 cryo testing proceeding at Massey’s.
-
Test article 43.1 testing to failure? Crumpled.
-
Falcon 9: Bandwagon-5, Starlink 15-15
-
Bandwagon-5 nested missions review
-
Rocket Lab Electron “We’re Not Hawking Around” Hawkeye 360 3rd mission
-
Rocket Lab Neutron 1st launch delayed due to carbon fiber manufacturing trouble. Tiny voids found.
-
JAXA MMX mission on Mitsubishi H2-24L, Mars Phobos sample return.
-
Blue Origin New Glenn tower rebuild progress, other Blue Origin updates