Highlights:
-
Flight 9 post op
-
Booster performed flawlessly through boostback.
-
One engine failed to light for landing, then fireball
-
Ship started tumbling shortly after SECO
-
Ship passivated before re-entry.
-
FAA mishap declared for ship loss of attitude control
-
Raptor 3 performance increase responsible for major payload to orbit increase
-
Starbase High bay demolition finished, to make room for Gigabay
-
Mars Heat Shield complications
-
Ship 38 parts headed for final assembly. Last of Block2 design
-
Ship 37 structural test campaign at Masseys
-
Pad B plumbing continuing with mount installed
-
Cargo Dragon CRS-32 returns to earth
-
Falcon 9: GPS III-7, Starlink 12-22, Starlink 17-1, Starlink 10-32
-
iSpace Resilience lunar landing expected this week
-
James Webb Space Telescope, focus on Abell S1063 grav lensing