Highlights:
-
“Carol of the bells with rocket nozzles”
-
Tower arms for Pad West, Pad West progress
-
Likely TF7 launch on January 10 based on FAA advisory
-
Blue Origin New Glenn launch license
-
Falcon 9: Bandwagon 2, Starlink 12-2
-
Rocket Lab Electron “Owl the Way Up”
Block 1 vs. Block 2:
-
Forward flaps smaller, thinner, and repositioned leeward ~20° to protect the hinges, reduce drag.
-
Flap tiles at hinge are substantially upgraded.
-
Reduced tiles at centerline between flaps, perhaps for ship catch clearance
-
Smaller tiles at body rings near stringers.
-
Much larger ship propellant tanks. 1200T => 1500T propellant mass increase.
-
Payload space moves to occupy space previously need by the forward flaps’ hardware, which is now much closer to the nose.
-
Ship propellant separation by Forward Dome and Common Dome replaced with new “EDome” designs. Design transfer from boosters.
-
New lifting points for both fabrication and operations.
-
Speculation on catch points.
-
Substantial plumbing changes. Including new downcomers for vaccuum engines.
-
Tail section vents